Monday, June 22, 2009

Jesse Jane Pirates Of The Carabian

Delivery Requirements Final 2009 - I



Court
Example Constructive and presentation model




Requisitos Final Delivery

Integral I II

General Plan 1 / 250
Sector Plans 1 / 100
Model 1 / 500 and Model 1 / 100
Lamina Sustentatoria project with 3d views (1 additional point) Format A1 Integral




III General Drawings 1 / 250
Sector Plans 1 / 100, 2 Cortes Construction 1 / 25
Model 1 / 500, Model 1 / 100, Model 1 / 25
Lamina Sustentatoria project with 3d views (1 additional point) Format A1



Model Presentation Requirements

* The model should have a rigid base with a thickness of 5cm.La minum base shall be the same treatment exteriores.Ej material: cardboard floors in the base model and well.
* Preferably not use artificial plants out of scale.
* Letterhead song stuck in the base.
General Notes:
reminder that should bring its model of the space edge of the first phase of the cycle, as well as their demo 1 / 500 of the school project.
Integral III students undertake the lift to the jury the same day of delivery. Must prepare in advance the sustainability of the project, showing information on the process, place, relationship with public space, etc.